Compiling the first unit Kakhovska HPS.. (1954)

Film-document №15137 1 part, Duration: 0:04:22, Black-white to collection Price category A

Availability of videosources

Needs clarification of possibility of digitizing in HD.

Producer CSDF (RCSDF)

Operators: Kovalchuk A.

Temporary description

Ukraine. Territory Construction Kakhovska HPS. Trestles, the dam, navigation lock. Installation 1st turbine power plant in the presence of engineers Kharkov Turbine Plant VM Osadcheva and BI Bondarenko. Installers IV Kite, FT Courneuve, VG Nefedkin, NG Osadchuk at work. Head of construction SN Andrianov, chief engineer of the construction of PS Neporozhny monitor the progress of construction of flyovers.