On the construction of hydro Kakhovska.. (1955)

Film-document №15407 4 parts, Duration: 0:39:24 to collection Price category A

Availability of videosources

Needs clarification of possibility of digitizing in HD.

Producer CSDF (RCSDF)

Operators: Rusanov P., Gutman I.

Temporary description

Various plans to build hydroelectric Kakhovska. The sinking ship lock pit, the pit spillway dam hydroelectric power station. Overlapping river Dnepr. Dump dump the pontoon bridge and dam rocky ground. Head of construction SN Andrianov and civil engineers monitor the performance of work on the construction of hydroelectric power plants. Film director Alexander Dovzhenko talking with an engineer construction.