General view of the Kama hydroelectric station. Recent work on the excavation and cleaning of the bottom of the excavation of the dam. From the excavation of the dam was evacuated equipment: tractors, excavators, motor vehicle. Members of the brigade AI Synkova mounted turbine wheel, water turbine power plant. Parsing jumper. Start the water in the pit of the dam. Flooded pit. Rotating shaft of the turbine. Shield management, substation, high voltage line. Chief Engineer hydroelectric AF Vasiliev, head of construction Ikomasov present when the submerged excavation of the dam.