Organization of the current content path (1972)

Documentary №40458, 2 parts, duration: 0:19:39
Director:V.Chinenov
Screenwriters:I.Svistunov
Camera operators:A.Dekach

Reel №1

Footage frameFootage frameFootage frameFootage frame

A speeding freight train.

Passenger train.

The train goes over the bridge.

The head of the Omsk distance of the way A.A.Tyurikov (synchronously).

Technical inspection of the tracks.

Inspection and measurement of switches.

Inspection of crossings.

A barrier is closed in front of the car at the crossing.

Detection of hidden defects in rails using a flaw detector.

Checking the main tracks with a high-speed track measuring car.

Production of anti-theft from rails unsuitable for laying.

Sleepers removed during major repairs.

The line for the restoration of sleepers.

Repair of crosspieces in the intervals between the passage of trains.

Locations: Omsk region [793]

Reel №2

Footage frameFootage frameFootage frameFootage frame

Stationary electric point.

Repair work.

Rail cleaning machine.

Cleaning of the interstices with the help of grab loaders.

Cleaning of the canvas from pollutants using snowplows.

Repair shops of the distance.

Storeroom.

Shower room.

Loading operations.

Control room.

Maneuver dispatcher.

Operational meeting.

Freight trains.

Locations: Omsk region [793]

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.