Phased reconstruction firstborn Siberian metallurgy (1986)

Documentary №40661, 2 parts, duration: 0:17:05
Production: Sverdlovsk newsreel studio
Director:M.Geller
Screenwriters:Komarovsky
Camera operators:Kochusov
Composers:Suslov

Annotation:

The film describes the restoration of the Guryev Metallurgic Works.

Reel №1

Footage frameFootage frameFootage frameFootage frame

Landscape.

The city of Guryev.

E.J. Klassen (synchronously).

The head of the rolling shop A.M.Vorobey (synchronously).

Photos of the workshops of the plant before reconstruction.

B.V. Ivanov (synchronously).

Rolling shop.

Design bureau.

Drawings.

Works on the reconstruction of the plant (photos).

Rolling mill.

New buildings of the plant (photo).

Finished products.

Personnel:

Klassen Ivanov

Locations: Guryev

Objects:

Guryev Metallurgical Plant

Reel №2

Footage frameFootage frameFootage frameFootage frame

Ball rolling complex.

E.J.Klassen-Director of the Guryev plant (synchronously).

The old foundry building, built in 1846 (photo).

Reconstruction works (photo).

Taking a metal sample.

Pouring metal into the bucket.

Coking conveyor.

Foundry shop.

Meeting with the director (synchronously).

Hardware shop.

Rolling shop.

General view of the Guryev Metallurgical Plant.

Locations: Kemerovo region [780]

Objects:

Guryev Metallurgical Plant

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.