The Earth is Waiting (1963)

Documentary №5789, 1 part, duration: 0:09:41, black-white
Production: CSDF (RCSDF)
Availability:Film hasn't been digitized
Director:Konovalov V., Ramenskiy V.
Camera operators:Danshin N., Epifanov G.
Anouncers:Shumakov G.
Text authors:Braslavskiy L.

Annotation:

About the Salavat Oil and Chemical Plant in Bashkiria (a region in the Russian Federation).

Temporary description:

As the field is man drives a tractor. The man in the field, holding the land. Construction Salavat petrochemical complex in Bashkortostan. Types plant. Factory workers at work. Operational Meeting on the selector holds Osipenko (synchronously). Types of plants, equipment, finished products - chemical fertilizers. Director of the newly built factory AI Berezovsky talks to the foreman of fitters IA Tarabrin (synchronously). Worked as a welder, crane operator. Construction night. It moves a column of vehicles. Installers for the work. The plow plowed land. As the field passes tractor.

Reel №1

A man is on the field.

Plowing of stubble - CU.

Human feet are on the plowed stubble.

Man takes the land, the land in the hands - CU.

The face and the eyes of a man - CU.

Daily morning RAM over the intercom at Salavat Petrochemical Combine in Bashkiria.

We combine Osipenko selector director, conducts workshops with RAM.

PNRM. to combine.

Is working with a torch, lighting the gas.

Burning gas - CU.

Several plans of action of the plant.

Plant workers - CU.

The technician in the laboratory.

In her hands the bottle to the chemical - CU.

The woman at the controls.

Report to department heads at (synchronously).

The shop works.

Items of equipment - CU.

On the conveyor is urea, which contains a large amount of nitrogen.

A worker at the machine bags with urea.

Finished bags.

Head of the new ammonia plant Ivan Afanasievich Berezovsky talking to the foreman Tarabrin IA, guiding assembly the assembly equipment for the largest plant for the production of ammonia.

Brigadier installers IA Tarabrin talking to the foreman of the roll Benjamin picked up and installed a multi-ton tower at a height of 30 meters (synchronously).

The installation work.

Lifting the 25-Teton column.

A column in the air.

The column was lowered to the section.

PNRM. mounted on the pipes.

Plow plowed land - CU.

Drives a tractor on the field - LS.

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.