Footage
Construction and repair of railroad tracks. (1920 - 1929)

Film-document №67466 8 parts, Black-white to collection Price category G

Not Digitized

Availability of videosources


Needs clarification of possibility of digitizing in HD.

Director: F.G.Uljrih

Operators: Rihard Linko,karl Veller

Reel №1

Germany. / As the leader tape 5th copy of the N 19387 /.

Work on the tracks.

They depart in front of the approaching train.

Station.

The circuit construction of the railway.

Cloth cutaway.

Basis / mound / sleepers, rails.

Driving mounting rails crutches.

Scheme of fixing rails to the sleepers iron.

Rail joints.

Mounting rails on a wooden joint.

Strengthening rail joint on a wooden, and then on the railway sleeper.

The value of purity gravel mound.

The break-up of contaminated gravel

Key words

Germany, construction, railway workers

Reel №2

Germany. / According to the leader tape part 1 copy N 19383 /.

Riggers attach the rails.

The rails are being taken away.

Worker taking notes.

The rails are cut with a special cutter.

The rails are cut autogenous setting.

A working machine.

Drilling holes in the bottom rail.

Grinding the rail surface.

Removing burrs.

Laboratory.

Measurement parameters of the rails.

In the shop.

Autogenous cutting rails.

Crimping special forms.

Laying rails.

The test site.

There is a train on rails

Key words

Germany, construction, railway, machinery

Reel №3

Germany. / As the leader tape part 2 copies N 19383 /.

Composition is on rails through the test area.

Processing sleepers.

Workers railway engineers in the area.

A group of workers.

Special devices on the test site.

Brake test.

Building a train.

Wagon-lab.

Workers in the locker room.

General view of the train.

Kitchen.

Cutting meat.

Chefs at work.

Working igruyut cards.

working lunch.

Their beds.

Workers on the line.

Puteizmeritelnye work.

Special puteizmeritelnaya truck.

Installation of the railway line section.

Work on the tracks.

The group of workers-railwaymen laid web.

The steam locomotive, steam locomotive with cars then pass along the rails

Key words

Germany, construction, railway, workers, equipment

Reel №4

Germany. / As the leader tape part 1 copy N 19387 /.

Obhodzhchik on the tracks.

The bursting of the rail.

It closes the way for the train.

Engineer gives the order to eliminate breakdowns.

The worker receives permission from the traffic service.

Naklvdyvaetsya temporary pad.

Meanwhile loaded materials and tools needed for replacement of rail.

Work to replace the rail lopnuvego

Germany. / As the leader tape part 1 copy N 19387 /.

Laying gravel.

Road vehicle.

Unloading rails.

Work cautiously remove the rails from the railcars.

Work to strengthen the way.

Master with a flag stop the train, telling about the bursting of the rail and the need to wait for imposing a temporary lining

Germany. / As the leader tape part 1 copy N 19387 /.

Master says about the path distance of the train delay.

Having received the message about the repair, the master gives permission to follow the slow speed of the train.

The train passes the damaged area.

Begins work on the rail replacement.

Workers drive up the rail instead of bursting.

A worker checks the strength of sleepers.

Replacing worn-out sleepers.

Driving driving spikes into railway sleepers made of soft wood.

The same work in practice.

Workers trim trunks, trimmed sleepers

Key words

Germany, construction, railway, workers, equipment Germany, construction, railway, transport, equipment, work Germany, construction, railroad workers, repair work

Reel №5

Germany. / As the leader tape part 2 copies N 19387 /.

On the way to be part of.

Travelogues workers reinforce the way.

With railcar unload the rails to replace worn.

Driving on the crutches of fastening rail sleepers.

Travel of workers at work

Key words

Germany, Railway, reconstruction work, work, machinery

Reel №6

Germany. / According to the leader tape Part 3 copies N 19387 /.

Scabbling sleepers.

Insert tab of fresh wood in an old, but still suitable tie.

Driving wear parts / crutches /.

Scheme other defects.

Work on replacing the rail joint.

View worn ligaments and joints of the rails on crutches

Germany. / As the leader tape 6th part of the N 19387 /.

Processing sleepers.

Preparation for laying sleepers.

Rails, sleepers and other materials near the railroad tracks.

Master gives workers instructions.

Travel operation

Key words

Germany, maintenance work, workers, railroad Germany, construction, railway maintenance work, workers, machinery

Reel №7

Germany. / As the leader tape part 4 copies N 19387 /.

On ways for trains.

Workers install a signal of temporary closure motion.

The workers start to work.

Carrying the sleepers and rails at the base of the canvas.

Laying sleepers.

Alignment of sleepers.

Laying rails.

Securing the first rail.

Placement of the second rail.

The adjustment path.

Control of the correct laying of the rails.

View gotoovgo way.

As it passes the train.

Continued rabot.

PNRM. a major railway junction.

Relsopochinochnye machines Krupp.

Driving the car operations.

Working on the road

Key words

Germany, construction, railway maintenance work, workers, machinery

Reel №8

Germany.

Strengthening slope railway.

Arrangement of drainage ditches.

The need to monitor the density of the mound.

Scheme Results trains passing along the path stacked loose on the mound.

However in practice.

View polluted interface.

Machine to seal the mound Krupp factories.

It is in action.

On the mound is compacted composition.

Workers continue working.

Workers go.

Master indicates inaccessibility to go to a parallel path.

Workers are busy packing the mound.

Passage of the train.

Unloading of wagons of rubble.

Placement and compaction of gravel

Key words

Germany, construction, railroad workers, repair work, equipment, vehicles