Plasme produces Energy. (1971)

Documentary №7103, 2 parts, duration: 0:17:51, black-white
Production: CSDF (RCSDF)
Availability:Film hasn't been digitized
Director:Konovalov V.
Camera operators:Pankin L.

Annotation:

The film is dedicated to the first in the world pilot plant equipment of direct transformation of thermal energy into electrical one by means of hydrodinamic method.

Temporary description:

The film tells about the world's first pilot plant for the direct conversion of thermal energy into electrical magnetohydrodynamic method. Used shooting as follows: construction of a power station with an MHD generator, installation of major units of the MHD generator inspection of machinery and plant units; assembly of control panels and electronic computers, managers and specialists conduct workshops pre-launch inspection station; physical start-up station 28 th March 1971, Academician, Chairman of the Committee on Science and Technology B. Kirilin congratulated the builders, the chief engineer of the station S. Piszczek and director of the Institute of High Temperatures, USSR Academy of Sciences and AE Sheindlin speaks of the importance of building the station (synchronously), the building, the sign , Departments of Thermophysics and Plasma Institute for High Temperatures, USSR Academy of Sciences; Institute staff in the laboratories of the work, meeting in the office of the Director of the Institute AE Sheindlin (synchronously); members of the Congress of power engineers in the meeting hall.

Reel №1

Academician VA Kirillin with scientists and builders at the opening of a new power plant construction congratulates - MS.

Engineer at the controls - MS., PNRM.

The shop power plant direct energy conversion, "U-25» - MS., PNRM.

Kraz on the highway - MS., CU.

Various power plants and high-voltage transmission lines - MS.

Integrated power plant model "U-02" with MHD generator - LS.

The building of the Institute of High Temperatures, USSR Academy of Sciences - LS.

A sign at the entrance to the Institute - CU.

Employees working in the laboratories of the institute: looking through a microscope with a variety of experiments, work to the drawing board - different.

Of the Institute is working on a computer - MS., CU.

In the department of heat-resistant materials officer investigates the structure of materials using high temperature microscope - MS., CU.

In the hall of the Congress of Power sitting audience, listening to the speaker - MS., CU.

Photo: Academician VA Kirillin with scientists and builders.

Photo: construction site of a pilot plant with an MHD generator - CU.

Workers and installers in the construction of a new power - different.

Construction of power plants under construction - LS., PNRM.

The oxygen of the future power plant: workers assemble the unit for oxygen plant - MS.

Indoor workers assemble the central control panel and electronic computers - LS., MS., PNRM.

At a meeting at the Institute of High Temperatures, said the director of the Institute for AE Sheindlin.

Director, the Institute and the chief engineer Pishchikov discuss the state of affairs on the construction of power plants (synchronously) - CU., MS.

Reel №2

On the road going heavily laden with equipment for KrAZ power - LS., PNRM.

Detail generator imported into the shop - MS., PNRM.

On the assembly of the generator present Director of the Institute for High Temperatures, AE Sheindlin, chief engineer and heads Pishchikov plants - different., PNRM.

Workers using a crane parts generator set - different., PNRM.

The shop plant director of the Institute for High Temperatures, member of the USSR Academy of Sciences, AE Sheindlin spoke about the importance of plants to the MHD generator (synchronous) - CU.

Specialists are checking on various sites of power plants using computer - MS., CU.

Oxygen shop power: the parts working units, frosted - MS., CU., PNRM.

Academician VA Kirillin, chief engineer and head of unit "U-25" Pishchikov, director of the Institute of High Temperatures, AE Sheindlin and other professionals in the control room and in the shop during the inspection of power plants "U-25" with an MHD generator - different., PNRM.

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.