For the Sample City (1978)

Documentary №8088, 1 part, duration: 0:04:58
Production: CSDF (RCSDF)
Availability:Film hasn't been digitized
Director:Kiselev YE.
Camera operators:Zavyalov G.

Annotation:

The advertising film for the Organization "Glavmospromstroymaterial" ["Main Moscow Industrial Construction Materials"]. About manufacturing of finishing materials for objects designated for the Olympic Games by industrial enterprises of the city of Moscow.

Reel №1

Moscow high-rise Embankment Building - LS. (With motion).

New to Volgograd Prospect - MS.

Houses on the Volgograd prospectus - LS., PNRM.

Combine fibreboard - LS., PNRM., MS., PNRM.

Unloading the wood waste in the plant - MS., PNRM.

Wood waste on a conveyor belt - MS., PNRM.

Chipping machine - MS.

Working at the console - LS.

Wood chips, shredded in chipping unit, pneumatically fed into defibrillators - MS., CU.

Operate defibrillators - CU., PNRM.

Work at the controls of a defibrillator - CU.

Defibrillyatorny shop - LS.

Rafinatory, which is a further refinement of chips and fibers impregnated with paraffin - LS.

Pulp goes to the casting machine - CU.

The casting machine - LS., PNRM.

Woodchip canvas on the casting machine - CU., LS.

Hot press for drying woodchip blade - MS.

Working at the control pressure - CU.

Plates are on the conveyor belt, cut to a certain length, fill-tier bookcase, a special pusher fed into the drying press - MS., LS.

Press dehydrates plate - MS.

Finished boards on the conveyor - MS., CU.

Heat treatment of plates - MS., PNRM.

Shop woodworking plant where made of fiberboard panels and doors for built-in cabinets - LS.

Layout apartment, view the cupboards and mezzanine - MS., CU., PNRM.

Work strengthens window unit in the machine - MS., PNRM.

Plant for the production shop window units to the public and unique buildings - LS., PNRM.

A worker at a machine for the manufacture of parts of window frames - MS., PNRM.

Window frames in the machine - CU.

Workers assemble a block of wood window frames and aluminum frames - MS., CU.

Worker puts the wall ready to frame, designed for Olympic-hotel complex in Izmailovo - MS.

Crane lifts the container window frames to the upper floors of house under construction - MS., PNRM.

The builder sets the window units - MS.

Panorama at the windows of the hotel complex - CU.

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.