About the reconstruction problems of Leningrad metal plant.
City of Leningrad, St. Isaac's Cathedral, a monument to Peter I, Peter and Paul Fortress. Shells department of the Leningrad Metallurgical Plant. Scientific and technical meeting of the heads and specialists of the plant on its reconstruction. Present, are: general director of the Leningrad Metal Works GA Shishov, chief engineer of the association AP Ogurtsov, Deputy Director General IK Surkov, Head of Development Mr. B.. sparrows. Renovation of the shops of the plant: destroy the wall, the construction work in the shop. Installing new machines in the shop. Production of modern turbines. Barge with turbine floats on the river Neva. Interview the workers of the plant, a public director of the National Museum of the Leningrad Metal Works Association ZN Nemcova (synchronously).
On the problems of reconstruction of the Leningrad Metal Plant.