Type of dam of Bukhtarma HPP.
Leadership of the construction on the podium solemn rally on the occasion of the launch of the first unit.
Type of dam from the Irtysh River.
Workers and engineers carry out a pre-start check of the machines.
The dispatcher in the control room speaks on the phone.
Solemn inclusion of the starting toggle switch.
Kind of solemn meeting.
The leaders of the construction and the region speak from the rostrum.
Landscape around Bukhtarma hydroelectric power station.
The face of the girl at the rally.
The face of a girl holding a bouquet of flowers.
Type of dam.
Guests enter the computer room.
Presenting flowers to guests.
The grand opening of the computer room, with the cutting of the red ribbon.
Participants in the solemn event go through the dam.
Toggle switch on the remote control.
The dispatcher speaks on the internal phone.
View of Bukhtarma HPP from the side of the Irtysh River.
Installation of one of the nodes of the transformer station.
Calendar: 1960
Locations: Kazakhstan
Seasons: Summer