Construction of Ekibastuz GRES-1 (1974)

Footage №82778, 40 footages, duration: 0:05:57

Scene №1 A poster with the inscription "Welcome" to Ekibastuz GRES-1

Footage frameFootage frameFootage frameFootage frame

Construction site.

A poster with the inscription "Welcome to the All-Union shock Komsomol construction site - Ekibastuz GRES-1".

The camera pans and switches to the station building under construction.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №2 A poster with the inscription "Welcome" to Ekibastuz GRES-1, part 2.

Footage frameFootage frameFootage frameFootage frame

Construction site.

A poster with the inscription "Welcome to the All-Union shock Komsomol construction site - Ekibastuz GRES-1".

The building of the power unit of the station under construction.

In the foreground is the SMK-101 MAZ-504A mobile crane.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №3 A poster with the inscription "Welcome" to Ekibastuz GRES-1, part 3.

Footage frameFootage frameFootage frameFootage frame

Construction site.

A poster with the inscription "Welcome to the All-Union shock Komsomol construction site - Ekibastuz GRES-1".

The building of the power unit of the station under construction.

There are workers in the foreground.

Personnel:

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №4 Truck-tractor MAZ-535

Footage frameFootage frameFootage frameFootage frame

The truck-tractor MAZ-535 carries a metal structure against the background of the building of the power block at Ekibastuz GRES-1.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №5 The truck-tractor is MAZ-535, part 2.

Footage frameFootage frameFootage frameFootage frame

The driver in the cabin MAZ-535.

The truck-tractor MAZ-535 carries a metal structure against the background of the building of the power block at Ekibastuz GRES-1.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №6 Bulldozer - DET-250

Footage frameFootage frameFootage frameFootage frame

The bulldozer-DET-250 passes against the background of the building of the Ekibastuz GRES-1 power unit under construction.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №7 Machine-scraper-MoAZ-546

Footage frameFootage frameFootage frameFootage frame

The Scraper-MoAZ-546 is passing through the building of the building of the power unit of Ekibastuz GRES-1.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №8 Welders work.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

Welders work.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №9 The building of the power unit of Ekibastuz GRES-1.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

A truck is passing by with the armature.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №10 The building of the power unit of Ekibastuz GRES-1, part 2.

Footage frameFootage frameFootage frameFootage frame

Panorama of the building site of the power block at Ekibastuz GRES-1.

In the background there are cranes.

The truck is passing by.

Key words

Electrostriction

Calendar: 1974

Locations: Kazakhstan

Scene №11 The building of the power unit of Ekibastuz GRES-1, part 3.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The crane lifts the beam.

The rigger is standing on the construction and waving his hand.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №12 The building of the power unit of Ekibastuz GRES-1, part 4.

Footage frameFootage frameFootage frameFootage frame

View from the cab of the truck to the building of the power unit of Ekibastuz GRES-1.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №13 Installation of the end anchor support of power lines.

Footage frameFootage frameFootage frameFootage frame

Ekibastuz GRES-1.

Installation of wires of the terminal anchor support of power lines.

Installers are working at height.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №14 Installation of the end anchor support of power lines, part 2.

Footage frameFootage frameFootage frameFootage frame

Ekibastuz GRES-1.

Installation of wires and insulators of the terminal anchor support of power lines.

Installers are working at height.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №15 Installation of the end anchor support of power lines, part 3.

Footage frameFootage frameFootage frameFootage frame

Ekibastuz GRES-1.

Installation of wires and insulators of the terminal anchor support of power lines.

Installers are working at height.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №16 Installation of the end anchor support of power lines, part 4.

Footage frameFootage frameFootage frameFootage frame

Ekibastuz GRES-1.

General view of the site of the terminal anchor poles of power lines.

Installers are working at height.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №17 Bus LiAZ-677 passing pointer Ekibastuz.

Footage frameFootage frameFootage frameFootage frame

Bus LiAZ-677 with passengers passing by the sign of Ekibastuz and a commemorative stele.

Key words

Motor transport

Calendar: 1974

Locations: Kazakhstan

Scene №18 Bus LiAZ-677 passing the index Ekibastuz, part 2.

Footage frameFootage frameFootage frameFootage frame

Highway in the steppe.

Bus LiAZ-677 with passengers passing by the sign of Ekibastuz and a commemorative stele.

Key words

Motor transport

Calendar: 1974

Locations: Kazakhstan

Scene №19 The rigger unwinds the cable.

Footage frameFootage frameFootage frameFootage frame

Construction site.

The rigger in the helmet and mittens unwinds the rope.

Calendar: 1974

Locations: Kazakhstan

Scene №20 The rigging is pulling the cable.

Footage frameFootage frameFootage frameFootage frame

Construction site.

The rigger in the helmet and mittens pulls the rope.

Scene №21 The building of the power unit of Ekibastuz GRES-1, part 5.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The lifting crane lifts the metal structure.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №22 The building of the power unit of Ekibastuz GRES-1, part 6.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The lifting crane lifts the metal structure.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №23 Rigger

Footage frameFootage frameFootage frameFootage frame

Construction site.

The waving hand.

Calendar: 1974

Locations: Kazakhstan

Scene №24 The rigging

Footage frameFootage frameFootage frameFootage frame

The riggers work at altitude.

The lifting crane lowers the metal structure.

Calendar: 1974

Locations: Kazakhstan

Scene №25 The building of the power unit of Ekibastuz GRES-1, part 7.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The lifting crane lowers the metal structure.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №26 That's part 2.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The rig works at altitude.

The crane drops the concrete slab.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №27 That's part 3.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The rig works at altitude.

The crane drops the concrete slab.

Calendar: 1974

Locations: Kazakhstan

Scene №28 The building of the power unit of Ekibastuz GRES-1, part 8.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The riggers work at altitude.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №29 The building of the power unit of Ekibastuz GRES-1, part 9.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The welder welds the metalwork.

The riggers work at altitude.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №30 The building of the power unit of Ekibastuz GRES-1, part 10.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

Top view of construction site.

Panning on the crane is lowering the concrete slab.

Key words

Power station

Calendar: 1974

Locations: Kazakhstan

Scene №31 The electric welder at work.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The electric welder fixes the electrode in the holder - fork-trident, lowers the welding mask- (flap), starts welding.

Sparks are flying.

Calendar: 1974

Locations: Kazakhstan

Scene №32 Electric welder at work, part 2.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The electric welder prepares the workplace, lowers the welding mask (shield), and starts welding.

Sparks are flying.

Calendar: 1974

Locations: Kazakhstan

Scene №33 The electric welder at work, part 3.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The electric welder in the welding mask (shield), welds the structure.

Sparks are flying.

Calendar: 1974

Locations: Kazakhstan

Scene №34 Electric welder at work, part 4.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The electric welder prepares the workplace, lowers the welding mask (shield), and starts welding.

Sparks are flying.

Calendar: 1974

Locations: Kazakhstan

Scene №35 What was, part 4.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The rigger watches the lifting of the crane metal.

Calendar: 1974

Locations: Kazakhstan

Scene №36 What was it, part 5.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The rigger holding the cable waving his hand, watching the lifting of the crane metal.

Calendar: 1974

Locations: Kazakhstan

Scene №37 That was, part 6.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

The rigger holding the cable controls the movement of the crane metalwork.

Calendar: 1974

Locations: Kazakhstan

Scene №38 The building of the power unit of Ekibastuz GRES-1, part 11.

Footage frameFootage frameFootage frameFootage frame

The building of the power unit of Ekibastuz GRES-1.

Calendar: 1974-1977

Locations: Kazakhstan

Scene №39 The building of the power unit of Ekibastuz GRES-1, part 12.

Footage frameFootage frameFootage frameFootage frame

Kunaev DA on the construction site communicates with the leaders of the region

Personnel:

Kunaev Dinmukhamed Ahmedovich - First Secretary of the Central Committee of the Communist Party of the Kazakh SSR.

Calendar: 1974-1977

Locations: Kazakhstan

Scene №40 The building of the power unit of Ekibastuz GRES-1, part 13.

Footage frameFootage frameFootage frameFootage frame

Kunaev DA on the construction site with the leaders of the region.

Calendar: 1974-1977

Locations: Kazakhstan

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.