Construction site.
A poster with the inscription "Welcome to the All-Union shock Komsomol construction site - Ekibastuz GRES-1".
The camera pans and switches to the station building under construction.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Construction site.
A poster with the inscription "Welcome to the All-Union shock Komsomol construction site - Ekibastuz GRES-1".
The building of the power unit of the station under construction.
In the foreground is the SMK-101 MAZ-504A mobile crane.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Construction site.
A poster with the inscription "Welcome to the All-Union shock Komsomol construction site - Ekibastuz GRES-1".
The building of the power unit of the station under construction.
There are workers in the foreground.
Personnel:
Power station
Calendar: 1974
Locations: Kazakhstan
The truck-tractor MAZ-535 carries a metal structure against the background of the building of the power block at Ekibastuz GRES-1.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The driver in the cabin MAZ-535.
The truck-tractor MAZ-535 carries a metal structure against the background of the building of the power block at Ekibastuz GRES-1.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The bulldozer-DET-250 passes against the background of the building of the Ekibastuz GRES-1 power unit under construction.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The Scraper-MoAZ-546 is passing through the building of the building of the power unit of Ekibastuz GRES-1.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
Welders work.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
A truck is passing by with the armature.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Panorama of the building site of the power block at Ekibastuz GRES-1.
In the background there are cranes.
The truck is passing by.
Key words
Electrostriction
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The crane lifts the beam.
The rigger is standing on the construction and waving his hand.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
View from the cab of the truck to the building of the power unit of Ekibastuz GRES-1.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Ekibastuz GRES-1.
Installation of wires of the terminal anchor support of power lines.
Installers are working at height.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Ekibastuz GRES-1.
Installation of wires and insulators of the terminal anchor support of power lines.
Installers are working at height.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Ekibastuz GRES-1.
Installation of wires and insulators of the terminal anchor support of power lines.
Installers are working at height.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Ekibastuz GRES-1.
General view of the site of the terminal anchor poles of power lines.
Installers are working at height.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Bus LiAZ-677 with passengers passing by the sign of Ekibastuz and a commemorative stele.
Key words
Motor transport
Calendar: 1974
Locations: Kazakhstan
Highway in the steppe.
Bus LiAZ-677 with passengers passing by the sign of Ekibastuz and a commemorative stele.
Key words
Motor transport
Calendar: 1974
Locations: Kazakhstan
Construction site.
The rigger in the helmet and mittens unwinds the rope.
Calendar: 1974
Locations: Kazakhstan
Construction site.
The rigger in the helmet and mittens pulls the rope.
The building of the power unit of Ekibastuz GRES-1.
The lifting crane lifts the metal structure.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The lifting crane lifts the metal structure.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
Construction site.
The waving hand.
Calendar: 1974
Locations: Kazakhstan
The riggers work at altitude.
The lifting crane lowers the metal structure.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The lifting crane lowers the metal structure.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The rig works at altitude.
The crane drops the concrete slab.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The rig works at altitude.
The crane drops the concrete slab.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The riggers work at altitude.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The welder welds the metalwork.
The riggers work at altitude.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
Top view of construction site.
Panning on the crane is lowering the concrete slab.
Key words
Power station
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The electric welder fixes the electrode in the holder - fork-trident, lowers the welding mask- (flap), starts welding.
Sparks are flying.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The electric welder prepares the workplace, lowers the welding mask (shield), and starts welding.
Sparks are flying.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The electric welder in the welding mask (shield), welds the structure.
Sparks are flying.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The electric welder prepares the workplace, lowers the welding mask (shield), and starts welding.
Sparks are flying.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The rigger watches the lifting of the crane metal.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The rigger holding the cable waving his hand, watching the lifting of the crane metal.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
The rigger holding the cable controls the movement of the crane metalwork.
Calendar: 1974
Locations: Kazakhstan
The building of the power unit of Ekibastuz GRES-1.
Calendar: 1974-1977
Locations: Kazakhstan
Kunaev DA on the construction site communicates with the leaders of the region
Personnel:
Kunaev Dinmukhamed Ahmedovich - First Secretary of the Central Committee of the Communist Party of the Kazakh SSR.
Calendar: 1974-1977
Locations: Kazakhstan
Kunaev DA on the construction site with the leaders of the region.
Calendar: 1974-1977
Locations: Kazakhstan