Footage
Start of blast furnace No. 4 in Temirtau. (1975)

Film-document №83679 1 footage, Duration: 0:03:21 to collection Price category G
  • Footages
  • 1

Scene 1 digitized in HD 0:03:22

Availability of videosources


1;

Needs clarification of possibility of digitizing.

Show links for downloading

Scene №1 Start of blast furnace No. 4 in Temirtau

Panorama of the part of the metallurgical plant in Temirtau, types of the plant.

Transportation of ladles to the iron foundry.

Types of the plant at night and at dawn.

Views and panorama of the solemn rally on the occasion of the launch of blast furnace No. 4 (top).

The management of the enterprise on the podium.

Prepare the blast furnace for start-up.

Types of the plant at dawn.

Faces of foundry workers.

Internal view of the dispatching room with an automated control system.

Check the readiness of systems to work.

Issuance of the first melting.

Production process in the iron foundry, the face of metallurgists.

Calendar

05.1975

Locations

Karaganda Oblast

Seasons

Spring

Industry