Bukhtarma HPP (1960)

Footage №83711, 1 footage, duration: 0:02:05

Scene №1 Bukhtarma HPP

Footage frameFootage frameFootage frameFootage frame

View of the reservoir Bukhtarma HPP.

The dam and reservoir of Bukhtarma HPP.

Waterfall from the dam of the hydroelectric power station.

Cranes on the dam of the hydroelectric power station, a turbulent water flow.

Passage by boat to the Bukhtarma reservoir.

View from the side of the boat for the construction of the Bukhtarma hydroelectric power station and the wake of the screw.

The boat sails along the reservoir.

Hall of power station management.

Heads cut the red ribbon.

Turn the switch of the first station block.

The device is a voltmeter.

The flow of Irtysh water flies from the dam.

The head reports on the phone about the launch of the first power plant unit.

Heads in the turbine hall of the station.

Operators in the control room of the power plant.

Key words

East-Kazakhstan region, Kazakhstan.

Calendar: 1960

Locations: Bukhtarma region, Kazakhstan.

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.