Homeland oil Buzachi (1980)

Footage №83880, 23 footages, duration: 0:04:19

Scene №1 Homeland oil Buzachi.

Footage frameFootage frameFootage frameFootage frame

Drilling rig and wagon moving on rails in the desert.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №2 Homeland oil Buzachi, part 2.

Footage frameFootage frameFootage frameFootage frame

The drilling rig and wagons move along the rails in the desert.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №3 Homeland oil Buzachi, part 3.

Footage frameFootage frameFootage frameFootage frame

The drilling rig and wagons move along the rails in the desert.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №4 Homeland oil Buzachi, part 4.

Footage frameFootage frameFootage frameFootage frame

The drilling rig and wagons move along the rails in the desert.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №5 Homeland oil Buzachi, part 5.

Footage frameFootage frameFootage frameFootage frame

The drilling rig and wagons move along the rails in the desert.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №6 Homeland oil Buzachi, part 6.

Footage frameFootage frameFootage frameFootage frame

Pipes for the rig are in the foreground.

A brigade of drillers goes through the desert on the middle ground.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №7 Homeland oil Buzachi, part 7.

Footage frameFootage frameFootage frameFootage frame

Drillers at work, fasten the drill pipe.

Rotates the swivel mechanism.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №8 Homeland oil Buzachi, part 8.

Footage frameFootage frameFootage frameFootage frame

Drillers at work, the drill pipe is lowered into the mechanism of the rotor.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №9 Homeland oil Buzachi, part 9.

Footage frameFootage frameFootage frameFootage frame

Drillers at work, preparing the drilling mechanism for operation.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №10 Homeland oil Buzachi, part 10.

Footage frameFootage frameFootage frameFootage frame

The driller mounts the drill pipe for descent to the winch mechanism.

The winch works, the gear-block block is lowered, the cables move.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №11 Homeland oil Buzachi, part 11.

Footage frameFootage frameFootage frameFootage frame

The worker rotates the valve of the pipeline.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №12 Homeland oil Buzachi, part 12.

Footage frameFootage frameFootage frameFootage frame

The worker rotates the valve of the pipeline.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №13 Cracked earth of the desert.

Footage frameFootage frameFootage frameFootage frame

Cracked earth of the desert.

Key words

Drought

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №14 Homeland oil Buzachi, part 13.

Footage frameFootage frameFootage frameFootage frame

The worker instructs his colleague next to the oil field pipeline distribution unit, a general view.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №15 Homeland oil Buzachi, part 14.

Footage frameFootage frameFootage frameFootage frame

The worker instructs his colleague next to the oil pipeline distribution center, close-up.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №16 Homeland oil Buzachi, part 15.

Footage frameFootage frameFootage frameFootage frame

Drilling rig in the desert.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №17 Homeland oil Buzachi, part 16.

Footage frameFootage frameFootage frameFootage frame

The drilling rig stands on rails, along the railroad tracks there is a tractor with laden rail cloths.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №18 Laying rail track.

Footage frameFootage frameFootage frameFootage frame

The tractor on the hook carries the rail track for the rig.

The rigger controls the transportation.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №19 Laying of the rail, part 2.

Footage frameFootage frameFootage frameFootage frame

The rigger controls the laying of the rail track for the rig.

Key words

Mine, Gas, Oil.

Calendar: 1982

Locations: The Buzachi peninsula, Kazakhstan.

Scene №20 Laying of the rail, part 3.

Footage frameFootage frameFootage frameFootage frame

Workers connect the rails for the drilling rig, tighten the bolts.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №21 Homeland oil Buzachi, part 16.

Footage frameFootage frameFootage frameFootage frame

Engineers communicate at the railing site for the rig.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №22 Homeland oil Buzachi, part 17.

Footage frameFootage frameFootage frameFootage frame

The welder works on the site next to the rig.

Welding of pipes.

Key words

Mine, Gas, Oil.

Calendar: 1980

Locations: The Buzachi peninsula, Kazakhstan.

Scene №23 Homeland oil Buzachi, part 18.

Footage frameFootage frameFootage frameFootage frame

The engineer communicates with the drillers at the construction site.

Key words

Mine, Gas, Oil.

Calendar: 1980

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.