About hydrobuilders, architects and builders of the Dniester Complex Hydro System, the Boguchansk Power Station at the Angara River and the cities Shevchenko, Navoi, Zarafshan and Baykal-Amur Railroad.
Builders at work: at a construction site, a device for welding. Construction of hydropower; overlap Angara in the 50-ies. Construction Boguchanskaya HPP - blasting, meeting at the laying of the 1st concrete slab. Bratsk hydroelectric plant. Interviews architect MI Simonova in the streets of Leningrad, studio architect. Construction of the Baikal-Amur Railway. Classes at the school of arts.
Bratsk hydroelectric plant - LS.
Cranes.
LEP - MS., PNRM.
The driver of the cab car - CU ..
PNRM.
Welder - CU.
Builders laid the rails - LS.
Construction of the hydroelectric complex on the Dniester - CU.
Worked as a welder - MS.
Builders said Brigadier I. Guzovaty (synchronous) - CU.
Builders, installers work - MS., LS., PNRM.
Newsreel 1956:
Overlap Sheds - LS., PNRM.
Builders rally - MS ..
PNRM.
The demonstrators applauded - MS.
Is a column of cars - LS.
Shimmering water flow - MS.
Boguchanskaya HPP construction - LS.
IB chief of construction Mikhailov - CU.
Blasting operations - LS.
Excavate - CU.
Construction of a house in a working village Kodinsky - CU.
Mikhailov talks with builders - CU.
Working crane - LS., PNRM. panel
Hydrobuilders rally to mark the laying of new cubic meters of concrete in the dam - LS., PNRM.
At the rally, advocates Mikhailov (synchronous) - CU.
Applaud builders - MS.
Bratsk hydroelectric plant - LS., PNRM.
LEP - CU.
Hydro turbine hall - CU., PNRM.
Bratsk Aluminum Plant - LS., PNRM.
Shop factory - LS.
Working at the stove - CU., PNRM.
Bratsk Timber Processing Complex - MS., LS., PNRM.
Leningrad - MS.
Nevsky Prospect - MS.
Architect, head of one of the architectural and planning workshops NI Simonov draws - CU.
Picture of - CU., PNRM.
Simonov and other architects in the studio to discuss the project - LS.
City layout - MS.
Navoi, reporting on city streets - MS.
Sculpture - CU.
Says architect Simonov (synchronous) in the studio - CU.
The sculptures in the studio - CU.
In the streets of the city of Navoi are people - MS., Shot through the fountain
Section of BAM - LS., Filmed from a helicopter
There is a train - LS.
The engineer in the train cabin - CU., PNRM. on track
Ridges - CU., PNRM.
Severobaikalsk, homes - CU., MS.
Go down the street newlyweds - MS.
Classes at the School of Art, depicts a girl - CU.
Dancing children - LS.
Laying of track, foreman builders Bondar directs construction - CU., MS.
Construction of a bridge over the river Vitim - LS., PNRM.
Sinker working in the tunnel - MS.
Car leaves the tunnel - LS.
Bondar says (synchronously) - CU.
Rails - LS.
Spruce branch on a background of water - MS.
Team members in the Cooper Basin, fishing, dine at the table - LS., MS.
Hand, pours soup - CU.
Hand delivers a plate of fish - CU.
Cabin windows are sanctified in snowy taiga - LS.
Powered tracklayers - LS.
BAM builders pass from the team Cooper - LS., PNRM.
City at BAM - LS., Filmed from a helicopter
Line BAM - LS., Filmed from a helicopter