Modern methods of servicing bulldozers and pipe-laying cranes (1985)

Movie №80233, 2 parts, Duration: 0:15:04
Studio -

Annotation:

The film shows in detail the procedure for servicing bulldozers and pipelayers between shifts, starting and stopping the engine.

Reel №1

Footage frameFootage frameFootage frameFootage frame

Bulldozer track.

The bulldozer moves along a snow-covered surface.

Cranes install a whip of large-diameter pipes in a trench.

Preparing machines for pipe-laying work.

Before daily servicing of the machine, the gear shift lever is set to neutral.

The brake lock and safety lever are locked.

The bulldozer blade and ripper are lowered to the ground or onto supports.

The pipe-layer boom is lowered to the ground.

The counterweight is moved back.

The bulldozer operator inspects the machine.

The machine is washed and cleaned of dirt.

After the external inspection, the tightness of the connections of all pipelines and high-pressure hoses, the condition of all containers and fasteners are checked.

The fastening of the air cleaner, turbocharger, muffler, road wheel covers and support rollers is checked.

The electrical wiring is checked for damage to the insulating coating and the fastening of the terminals.

A cartoon explaining how to check the coolant level in the radiator.

Topping up the fluid.

Checking the diesel fuel level in the tank.

Checking the fuel in the petrol tank.

Checking the oil level in the engine crankcase and the viscosity of the oil.

Checking the oil level in the slewing clutch crankcase.

Close-up of the machine operator.

Checking the oil level in the hydraulic system reservoir.

Checking the oil in the winch crankcase of the pipelayer crane.

Add oil if there is not enough oil in the crankcase.

Daily maintenance of the bulldozer includes feeding consistent grease through special nipples.

A cartoon explaining this procedure.

When servicing the pipelayer, it is necessary to lubricate the bearing in the hooks, boom mounting pins and idler pulley axles.

The cylinder mounting pins and counterweight frame are lubricated in 12 places.

Before starting work, drain the sediment from the fuel tank.

Check the travel of the brake pedal.

A cartoon explaining the procedure.

The structure of the pipelayer cabin.

Starting the engine.

Keywords

Bulldozer, Pipelayer, Shift service, Wiring, Carter, Hydraulic system, Engine

Seasons:

Winter

Chronicle Subjects:

IndustrySectors of the economy

Reel №2

Footage frameFootage frameFootage frameFootage frame

Starting the engine.

Engaging the starter.

Warming up the engine.

The instrument showing the oil pressure.

Checking after starting the engine.

Instrument readings after starting the engine.

Inspecting the vehicle.

Moving off and stopping the vehicle.

Maneuvering the vehicle.

A sudden stop can cause the turbocharger to fail.

Alternating shots of pipes being laid in trenches.

Panorama of the pipeline under construction.

Keywords

Engine, Pipelayer, Pipeline

Seasons:

Winter

Chronicle Subjects:

IndustrySectors of the economy