The film, shot as a training aid, shows the initial stage of disassembling a turbo block.




Compressor station.
Workers begin disassembling the turbo unit.
Insulation mats are removed.
The turbine cover fasteners are disassembled.
The cap nuts on the horizontal connector of the turbine casing are unscrewed.
The cooling air supply pipes are removed.
The bolts are unscrewed from the vertical connector of the casing.
Disassembling the cover from the connector.
Moving the cover around the shop.
Disassembling the axial compressor cover.
First, the mounting pins are knocked out.
Lifting the axial compressor cover.
Disassembling the inner casing of the low-pressure turbine.
Eye bolts are inserted.
Disassembling the spacer.
Disassembling the oil vapor suction pipeline.
The released flanges are cleaned and closed with covers.
The bearing housing is disassembled.
View of large turbo unit components.
Turbo block, Compressor, Turbine, Spacers, Bearing