Add to cart To the collection
Construction of Mysovy Tunnels on the Baikal-Amur Mainline
USSR. Buryat ASSR. A team of tunnelers led by F. Kh. Gafurov from tunnel squad No. 16 of the BAMtonnelstroy Construction Directorate at the construction of Mysovoy Tunnel No. 3 near the shore of Lake Baikal on the Severobaikalsk-Kichera section of the Baikal-Amur Mainline. Viktor Velikzhanin, Vladimir Matvievsky/TASS
| Location: | USSR, Buryat ASSR |
| Photo: | №140925 |
| Date of shooting: | 10.02.1983 |
| Authors: | Matvievsky Vladimir Velikzhanin Victor |