Add to cart To the collection
Construction of the Baikal-Amur Mainline
USSR. Buryat ASSR. Members of tunnel team No. 13 of Gennady Kuznetsov of the BAMtonnelstroy Construction Directorate during the excavation of a loop tunnel on the Severomuysky bypass of the Nizhneangarsk-Vitim section of the Baikal-Amur Mainline. The railway was forced to be laid around the protracted construction of the Severomuysky tunnel. Vladimir Matvievsky/TASS
| Location: | USSR, Buryat ASSR |
| Photo: | №141012 |
| Date of shooting: | 11.16.1987 |
| Authors: | |