Add to cart To the collection
Construction of the Severomuysky tunnel on the Baikal-Amur Mainline
USSR. Buryat ASSR. Members of Nikolai Petrovich Droval's team from tunnel detachment No. 18 of the BAMtonnelstroy Construction Directorate during excavation work in the face of the western portal during construction of the Severomuysky tunnel on the Nizhneangarsk-Vitim section of the Baikal-Amur Mainline. Vladimir Matvievsky/TASS
| Location: | USSR, Buryat ASSR |
| Photo: | №164934 |
| Date of shooting: | 03.29.1984 |
| Authors: | |