Add to cart To the collection
Dalenergomash plant in Khabarovsk
USSR. Khabarovsk. Fitters-assemblers N. Gribanov, A. Tugarikov, B. Chipizubov and electrician K. Karpenko (from left to right) during the installation of the turbocharger rotor of the GTK-10-2 gas turbine in the general assembly shop at the Far Eastern Power Engineering Plant. Yuri Muravin/TASS
| Location: | USSR, Khabarovsk |
| Photo: | №189666 |
| Date of shooting: | 10.04.1974 |
| Authors: | |