Ukraine. Aggradation dredgers earthen dam, which will link the dam to the shore of the river Dnieper. Ship dredger Onega works on excavation closure channel (temporary passage for passage of water during the construction of the dam). Unloading arrived at the assembly site of the first transformer. Installation of turbine wheel. Installing the impeller into the crater of the second turbine.