The advertising film for the Organization "Glavmospromstroymaterial" ["Main Moscow Industrial Construction Materials"]. About manufactuing of structures required for the underground construction.
The new district of Moscow - LS., PNRM.
Zero cycle construction house - MS., PNRM.
Panorama from new home construction of underground utilities - CU.
Animation: the scheme of underground utilities - CU.
Lay the pipe; tubing, parts collectors, elements subways - CU., LS.
The factory building concrete products - LS., PNRM.
The process of making pipes for underground utilities - in the outer metal mold is installed reinforcing cage, with a skeleton form - MS., LS.
Metal form with reinforcement cage is moved to the post of molding - LS.
Entry form core and fed concrete mixture, the compressor - MS., CU.
Pipe in the form of thermal treatment is applied to - LS.
With the finished pipe to remove the metal form, takes the tap on the pipe pressure test - MS.
The process of manufacturing reinforced tubing filled with concrete, sealing the mixture on a vibroploschadi prigruza; removed prigruza tubing and served in steaming chamber, are ready tubing - CU., LS.
A sign with the words: "Concrete Products Plant № 23» - CU.
Shop factory, which produced large-sized structures for civil engineering - LS.
Production volume of sections of tunnel junctions - section in the shape of the tunnel - MS., CU.
Working at the console - CU.
Clip bead shape, served mixed concrete; fitting lid - LS., MS., CU.
The hand presses the button - CU.
Open side of the form - CU.
Removable core - LS.
Removable section of the tunnel - LS.
Section of the tunnel to the car removed from the plant - LS., PNRM.
Subways - LS., PNRM.