Panorama of the quarry of the Tishinsky mine.
The excavator bucket cuts into the ground.
The excavator pours the rock into the truck body.
Excavator in the cabin at work.
View of the quarry.
The general plan, the excavator pours the rock into the truck body.
The girl-dispatcher speaks on the phone.
The dispatcher writes in the magazine.
View of the quarry.
View of the tower and quarry.
Excavator ECG-5 pours the rock into the body of the dumper.
Dump trucks MAZ-525 approach the loading to the excavator ECG-5.
MAZ-525 dump trucks are moving in the careers.
Control panel brave installation.
Operator brave installation at work.
Crawler-propelled drilling rig.
Bur drifts into the ground.
Mast of drilling.
Dump trucks MAZ-525 and BelAZ-530 go on a career.
The operator is brave.
Key words
Zinc, Copper, Gold
Calendar: 1967
Locations: Tishinsky mine, Ridder, Kazakhstan